Ward Structural and Civil Engineering team are currently working on a scheme at a residential site in Wheldrake, York. Due to planning restrictions, the scheme has been designed to incorporate a basement, within the two-storey building, in order to maximise space.
Our team have provided structural engineering services including detailed design of the basement structure and superstructure. Ward also designed and detailed the drainage to the site including an attenuated surface water system.
The basement box has now been complete, with blockwork due to commence on Monday 20 October, with ground floor planks due the following week.